Capitol Hill Home
A down-to-studs remodel, this 1926 home received all new plumbing and electrical, as well as seismic anchoring to the concrete foundation. The existing stair was removed, and a new one built in its place on the opposite side of the house. Other upgrades included a new kitchen, two new baths, a new bedroom, and new flooring in all the rooms. Brightwork Builders was the general contractor. Steve Skonieczny furniture maker.
John M Feit designer and project manager.